Projects Electrical Mechanical Main Contracting Warsash Fire Training Centre, Mechanical and Electrical Installation Beatties have recently completed the pipe work and electrical installation of a new mains water pumping system and water storage tank that feed to fire hydrants at the Warsash Fire Training Centre… Download Case Study Science Laboratory Refurbishments, Mechanical Installation Beatties were employed to carry out the complete supply, installation and commissioning of the mechanical services… Download Case Study CAT A Office Fit-Out, Mechanical Installation Beatties Mechanical installed a number of Plasma Air PA604 ionisers to the new fan coil units (FCU)… Download Case Study Refurbishment Project, Mechanical and Electrical Contractor Beatties completed a four week M&E installation as part of the refurbishment works to Longbarn for use as offices for the OPCC… Download Case Study Replacement AHU Cooling Coils, Mechanical Installation Beatties were employed to carry out the supply and installation of three new air handling cooling coils… Download Case Study New Commercial Tenant Supplies, Main Contractor For around 3 or 4 years this project has been off and on but we finally completed it just recently and we look forward to the new tenand taking their space... Download Case Study Private Residence, M&E Installation Beatties have relished playing our part on this monster build where attention to detail was key... Download Case Study Commercial and Residential Refurb, Main Contractor Beatties won a competitive tender against three other companies to secure this project in Poole... Download Case Study Secondary School, M&E Installation Beatties are pleased to have completed the M&E installation at a Farnham based Secondary School with LST Projects... Download Case Study Bioquell, M&E Installation Beatties were appointed to undertake the M&E installation works on an industrial refurb project in Andover... Download Case Study Woolgate Centre, Main Contractor Beatties were employed by Workman LLP as the main contractor to oversee the testing and validation of the existing mechanical & electrical service equipment in a vacant retail unit... Download Case Study Fusion, Main Contractor Beatties were appointed as the main contractor to reinstate part of the ground floor of a landlord space back to its original floorplan... Download Case Study Tower Place, Fan Coil Refurbishment Upgrade Beatties completed the on site refurbishment of 500 existing floor mounted fan coil units on a project located next to the historic Tower of London and Tower Bridge... Download Case Study Archway House, Main Contractor Beatties are able to offer a number of services in house such electrical remedial works and upgrades, fire alarm installations, fabric repairs and builders work thus reducing over heads and costs to our clients... Download Case Study National Maritime Systems Centre, Fire and Security Wiring Beatties were contracted to install the fire alarm, access control and intruder alarm system throughout the centre.. Download Case Study Shopping Centre, AHU Motor & Invertor Upgrades Beatties completed the first phase of the centres AHU motor and invertor upgrades, helping towards… Download Case Study Shopping Centre, Dining Area Refurbishment Beatties were awarded with the refurbishment works for a new dining area situated off of the food hall in… Download Case Study 33–35 Above Bar, Retail Unit Strip Out Beatties were awarded the Electrical and Mechanical installation package, for a multi residential building located… Download Case Study St Stephen Road, Mechanical and Electrical Installation Beatties were awarded the Electrical and Mechanical installation package, for a multi residential building located… Download Case Study Shopping Centre, External Lamp Posts and Uplighters We were approached by the client who wanted to replace their existing external lamp posts and uplighters... Download Case Study Shopping Centre, Podium Toilets Beatties were employed to carry out the replacement works of x3 Megaflo direct unvented hot water cylinders, plus all... Download Case Study Greenhill Farm, Electrical Install Beatties were delighted to be awarded the electrical contract for a new modern country house situated in… Download Case Study Shopping Centre, Bridge Canopy Lights Our client had a number of their lights vandalised along an enclosed walkway and we were tasked with replacing the… Download Case Study Leisure Development, Grand Stairs Beatties designed and installed stainless steel hand rails, resin nosings and tactile paving for this main entrance and stair case to... Download Case Study Shopping Centre, Decorative Escalator Panels This project involved the safe removal of the existing ageing, off white planilaque escalator panels and… Download Case Study Ice Rink, Power Supply Beatties installed a 400A three phase supply to a seasonal 900 square metre ice rink… Download Case Study Shopping Centre, Mall Doors After nearly 20 years of use it was decided that the laminated doors… Download Case Study Shopping Centre, Victaulic Pipework Repair Beatties were contacted to rectify a major water leak on the main Cat 5 water pipework… Download Case Study Spaces, Fan Coil Refurbishment Investigate heating and cooling issues of office fan coil units… Download Case Study Shopping Centre, A2 Plant Room Changeover works of a new ventilation Aerofoil axial fan... Download Case Study Shopping Centre, PAVA & AHU Refurbishment works of 3 Air Handling Units and replacement of the existing public address voice alarm (PAVA) system... Download Case Study